Wall Preperation

08.05.2018
16:48
Comments Off on Wall Preperation

Preparation of walls, floor and ceiling began to Ddya determine the type of finish and quality of the walls. Preparing walls for painting and wallpapering to determine the quality of the wall (and, hence, subsequent work), it is necessary to determine verticality of the walls plumb, and the evenness of their long rail (the rule). Similarly define ceilings, horizontal level, or building operdelyaetsya gidrourovnem. Putty can "take" only a minor irregularities (up to 5 mm). It is therefore very uneven walls line the first by plastering or drywall sheets sheathe. Depending on the follow-up walls or ceiling is determined by the type of fillers and mixtures puttying quality surface.

Under the thick textured wallpaper is enough to level the surface (rather 1.2 layers) and sand float with a large cloth. Puttying 'painted' (especially if not before staining plan to fleece sticking) requires gorazzho more careful approach. Usually placed at least 3 layers of filler, which are carefully vyshkurivayutsya, the last – small cloth. To the light bulb powerful should not be seen Even small scratches or pits. If any, of them separately and then again zashpaklevyvayut vyshkurivayut. With a significant deviation from the vertical walls of plaster or to bind sheets of drywall. However, if owner does not intend to make a 'perfect' repair, then you can do without it. Although the vertical deviation of 1 cm or more may already be evident, especially on the walls, lined with tiles.

Especially in the wall curves apartments model project is a bathroom wall, as well as partitions between rooms. In the definition of surface roughness to fasten to a wall normally in its various locations. (Source: Coupang). If the gap between the wall and the rule does not exceed several millimeters, it will be sufficient to plastering work. If significant differences are visible, you must first make a plaster works. It is also possible to sheathe plasterboard. In general, if space permits and humidity of the room, then leveling the surface (and vertical) gypsum sheets zanmaet much less time (and probably money) than plaster. This is especially true ceiling plaster which costs about ….. per square meter and is considerable time. No matter line the walls with plaster, plasterboard or not, they must then putty. Surface preparation for laying tile: For tile is not necessary to perfect align the surface. Enough so that it is vertical and relatively smooth (bumps and holes in neskoluo dopuskayutya millimeters). If the wall is deflected from the vertical by 1-2 cm, an experienced tiler will be able to deduce the vertical tiles. But it must negotiate with the workers. Of course, laying on the curves and nonvertical walls will be more expensive. If the deviation from the vertical wall or large severely damaged, it is necessary to first plastering work. Preparation of the sexes. After removing the old coating is determined by the horizontal floors and their status. If the horizontal level of the master suit, close up enough to eliminate defects in sex-cut hills and repaired pothole solution. If the level floors littered with strong and very significant defects, you must fill screed. If you plan on tiling, small differences can align itself in the process of laying tile. For Laying laminate flooring, linoleum flooring and need a quality tie. Sometimes sex is used to align the leveling mixture. The price of the work is highly dependent on the fiber necessary to align the floor, walls or ceiling on the volume of the works themselves (that is, squaring the room, the smaller – more expensive)

Comments are closed.