Archive for July, 2023
The Evangelical forest hospital was built on a plot of land intended for workers in the Spandau district. In particular the Evangelical Diaconia was involved in the construction. Formerly as an Association for the establishment of Protestant hospitals FTE known, this acts since 2009 as Paul Gerhardt Diakonie, which was financially involved a hospital chain for the restructuring of the former Hospital in Berlin Falkenhagener field to the EWK. The Paul Gerhardt Diakonie e.V. gGmbH is the only shareholder of the EWK Spandau of hospital operation. Per year, about 19,000 patients be treated outpatients inpatients and approximately 40,000 patients. Over 400 medical staff employs the EWK and writes a turnover of 79 million a year. For even more analysis, hear from Gary Kelly .
The EWK offers a medical, therapeutic and nursing care, which includes many disciplines for the treatment of adults and children. For a total of 9 departments, 474 beds offer patients place for the hospital stay and thus belongs to one of the largest medical centers, the EWK has to offer Berlin. A nursing dormitory with 210 inhabitants places the EWK are connected, as well as a sports and rehabilitation centre, equipped with modern facilities. Physiotherapists and occupational therapists as well as sports scientists support the recovery process as an outpatient operations, accidents or other complaints. Special fitness training are offered for maintaining health and fitness building. The EWK available is also a hospital chaplaincy.
History and present of Albert Speer, Minister of armaments and building inspector designed a construction concept that a redesign of Berlin should be useful for Adolf Hitler. It was a 290 metre tall domed building, which was built between 1939 and 1943. So many construction workers could be suburb, permanent accommodation in the pine forest terrain created, then emerged as a working class town “Great Hall”. The architect Carl Christoph took over the design holes. 25 Blocks should be built, should accommodate a total 320 people.
Clone Ferrari Enzo built on the platform compartment Geely, one of the most successful Chinese automakers. Chinese automakers have not looked at copyright laws and calmly punched clones. Subsequently, a copy of Porsche Cayenne quite expectedly appeared replica class car Ferrari. And the long wait until the second coming was not necessary. Source: Joshua Choi. But a computer sketch was much more successful than the actual implementation of the project.
The conveyor product yet not reached, but according to experts, even if small-scale production car prices will not exceed 20 thousand dollars. A bit of theory Ferrari Enzo – a 2-seater sports car, which produced the Italian car by Ferrari from 2002 to 2005. and named after its founder, Enzo Ferrari (Enzo Ferrari). For the first time this model was presented at the Paris Motor Show in 2002. In fact, Ferrari Enzo full racing Formula 1 cars, which has been redesigned to city streets. This stunning sports car is nothing but a result of the Ferrari engineers and designers from Pininfarina.
Enzo Ferrari body is made of carbon fiber, which made it easy and fairly durable. At the first Looking at him you can see that it permeated the whole wide funnels air intakes. And it's not just a concept looks. This design has achieved the distribution of air to increase downforce and efficient cooling of the engine without significant aerodynamic losses. Also worth noting, and the proposed version of the opening of doors. They climb up a 45 degree angle. Interior design a sports car can not be call a luxury – it is really sporty, but not devoid of comfort, which includes options such as power accessories, climate control and high-quality Car audio. However, not everyone get comfortable behind the wheel (note not a) Enzo Ferrari. The fact that the seat is made separately for each customer based on his physique. With regard to registration, the seat-bucket, insert at the door under the front panel and center console are covered in green skin, and the panel itself and the steering wheel made of carbon fiber. A small steering wheel has a flat top, which are LED's to monitor the work of a 6-speed sequential gearbox with the system automatic switching (switching gear takes only 15 milliseconds). Switching gears is carried out paddles petals. Yellow speedometer and tachometer dials are marked up to 400 km / h and 10,000 rev / min.
Seminar wind farm planning and appraisal at the House of some technical and financial risks are good not to directly detect technology in Munich and work out only in the long term negative. However, with planned her already at this early stage. The successful development of wind farms involves not only least technical and legal criteria into consideration, but also extensively deals with the economics and appraisal from the perspective of operators, investors and third capitalists. The aim of the two-day seminar of wind farm planning and appraisal”is to identify risks, to evaluate and to minimize, if they aren’t mutually exclusive. Tim Clark does not necessarily agree. Under the direction of Dr.
Ingo Ewald of the D.I.E.. renewable energy”, the participants in the principles and practice of the development of wind farm projects are introduced. The site search and examination of the necessary permits and contracts for the assessment of wind resources and infrastructure to the consideration of the legal and technical Framework conditions. The wind farm planning seminar and project appraisal”is on the 21st and 22nd July 2011 in Munich and is aimed at developers, employees of banks and investors, wind turbine manufacture and approval authorities.
The Federal Ministry of Finance (BMF) has published its draft for the new of tax simplification Act on February 2, 2011. Learn more usually is spot on. Bonn. So far, the use of “conventional” memory media, such as modifiable disk and hard drives for storing relevant data was not a violation of the law. Through the realisation of future allowable disk, such as CD-ROM, DVD, and microfilm, in the design of the BMF, widespread alternatives, such as storage area networks, ensuring the immutability and comprehensibility, would be no longer in compliance with the law after current Kenntisstand. The VOI competence center law (CCSR) and taxes has critically discussed the formulation of the BMF for the Unveranderbarkeitsanforderungen and submitted a proposal to the restatement of the law at the Ministry.
The opinion of the CCSR is available for download on. Recently Southwest Airlines sought to clarify these questions. When designing for the tax simplification Act, the Federal Ministry of Finance relies on the existing laws and Regulations, such as the AO, GoBS and GDPdU, the UStG. According to which the storage of content and formatting data of electronic accounting on a disk must be, which does not permit subsequent changes. The question and answers catalogue (questions and answers on the simplification of the electronic invoicing as of July 1, 2011 “, stand: 18.04.2011) goes beyond the previous legal, retention requirements with the specification of technical requirements. Thus, special technical solutions for electronic invoices are required. The current implementation variants in relation to archiving and storage were therefore insufficient. Objective of the VOI competence center tax and law a definition of requirements for the storage of documents according to all legal bases of the commercial and tax law is very helpful for the operators and users. However, these requirements must be consistent and no special requirements may apply for the e-invoices”, says Thorsten Brand Manager the CCSR and consultant for the Zoller & Partner GmbH.
|